Listning ID 396048 Description
We bring to your attention solid fuel pyrolysis boilers of the KFPV series, the principle of operation of which is based on the combustion of wood gas released during the smoldering of firewood. Due to the fact that combustion goes from top to bottom and the main heat exchanger is located in the lower part, there is a maximum heat transfer and heating of the coolant. Pyrolysis solid fuel boilers of long burning are several times more efficient than conventional ones! The fuel for these boilers are: firewood, wood waste, fuel briquettes, straw, husks, corn cobs, etc. (except coal!) These furnaces heat rooms up to 6000 cubic meters! KFPV boilers are designed for heating individual residential buildings, industrial premises, warehouses, car washes, gyms, livestock farms, poultry houses, greenhouses and other large premises, and are also used for drying wood, grain, mushrooms, berries, medicinal plants. Technical characteristics of pyrolysis air heating boiler KFPV-150 Heating capacity kW 150 The volume of the loading chamber (gas formation) m3 0.84 Operating air temperature 0С 150 50 Efficiency at fuel moisture content: % 20% - 90 40% - 82 Nominal negative pressure behind the boiler (no more) Pa 40 Outgoing gases temperature (not less than) 0С 150 Power consumption kW 1.6 Supply voltage V 220 Chimney diameter mm 200 The volume of the heated room m.kub. 6000 Maximum length of firewood mm 1000 Overall dimensions, mm Depth 1900 Width 950 Height 1930 Weight kg 1650 Used fuel Firewood, briquettes Basic equipment of the pyrolysis boiler for air heating KFPV-150: - firebox lined with ShA-5 refractory bricks, size, mm: 1000x700x1200, volume - 0.84m³; - heat exchanger pipes (thickness 3.5 mm); - heat exchanger housing (steel, thickness 5mm); - boiler control automation (manufacturer - Poland). Additional equipment (as agreed with the customer): - heat-saving casing of the heat exchanger made of basalt wool; - fan VTS 4-75 No. 4, 3000 rpm, 4 kW/h. Warranty maintenance of the boiler is 24 months, electrical and electronic components - 12 months. Equipment delivery time: 14-20 days.
It is possible to install a burner that works on waste oil and any liquid fuel. Installation of automatic ash removal is possible. Our website: http://kfk.com.ua/ Additional information
Reviews
Customer reviews for this ad are not available. We will be very grateful if you leave first. Write to author
Related ads
© 2001-2024 Avito Ukraine. Website #1 avito.ua free classified ads of Ukraine in all regions of Ukraine (except temporarily occupied territories). All rights reserved. Using this website, including the supply of ad means you accept user agreement . This bulletin board has been working for 15 years on the equipment ordered on the Servers in Ukraine website. |